|
CHAPTER 2 |
THE LIGHTFUL HOUSE |
12 |
|
A |
Life in 4D |
" |
|
2-1 |
RBF Sketch
of Comparison Between Conventional & 12-Deck 4-D "Lightful House" (1927) |
13 |
|
B |
Ephemeralization |
14 |
|
2-2 |
RBF's Next
to First Suspended Wire Wheels Model |
15 |
|
C |
4D Towers |
17 |
|
2-3 |
Sketch of a
Series of 10-Deck Luxury 4-D Homes Overlooking the Sea |
" |
|
2-4 |
Sketch of a
Proposed 10-Deck
Suspension Bridge |
18 |
|
D |
The 4D Dymaxion
House |
" |
|
2-5 |
Model by S
Burgess of a 4-D 10-Decker with a Wind Shield being Tested in a Wind Tunnel |
19 |
|
2-6 |
Cartoon of
People Trying to Build from Scratch their own Car in their Driveway |
20 |
|
2-7 |
Painting by
Malcolm Wells of a 4-D House Subdivision |
22 |
|
2-8 |
Model of 4-d
House with Nude Lady on Bed Exhibited at Marshall Field Dept Store, Chicago,
IL, USA ('29) |
23 |
|
2-9 |
Drawing of
Plan, Isometric & Elevation of 4-D House |
25 |
|
E |
The Dymaxion
Mobile Dormitory |
26 |
|
2-10 |
8 Drawings
of the Erection Sequence of a Dymaxion Mobile Dorm Intended for use in
Russia |
" |
|
F |
The Autonomous
House |
28 |
|
G |
Packaging Toilets |
30 |
|
H |
Fog Guns |
31 |
|
I |
The Dymaxion
Bathroom |
32 |
|
2-11 |
Pic of Lower
Section of Dymaxion Bathroom |
" |
|
J |
Corrugated
Cottages |
35 |
|
2-12 |
Pic of a
Standard Grain Bin from the Catalog of Butler Manuf Co, Kansas City, MO, USA |
35 |
|
2-13 |
Units
Assembled from Top Down Using a Mast |
36 |
|
2-14 |
Pic of
Interior of 20'-Diam DDU |
" |
|
2-15 |
DDUs
Deployed in Persian Gulf During WWII |
37 |
|
2-16 |
Painting
Depicting Use of DDUs at Air Force Base (1942) |
" |
|
2-17 |
Housing
Experiment of R Reines' Integrated Living Systems Using Steel Silo Tops
(1996) |
38 |
|
2-18 |
External
View of Experimental House by M & E Jantzen Using 24'-Diam Steel Silo Tops,
IL, USA (1981) |
39 |
|
2-19 |
Internal
View of Experimental House by M & E Jantzen Using 24'-Diam Steel Silo Tops,
IL, USA (1981) |
" |
|
K |
Swords Into
Plowshares |
40 |
|
2-20 |
36'-Diam
Wichita House Weighed 3 Tons & was Assembled by 16 Workers in 2 Days (1946) |
41 |
|
2-21 |
Wichita
House: Sketch of "Airbarac" Version |
43 |
|
2-22 |
Wichita
House: Sketch of 4-Deck Hospital Version (4-10-41) |
" |
|
2-23 |
Wichita
House: Rotating Vent Panels Being Formed at Beech
Aircraft, Wichita, KS, USA |
44 |
|
2-24 |
Wichita
House: Inspecting a Sheet Metal Deck Stamping at Beech
Aircraft, Wichita, KS, USA |
45 |
|
2-25 |
Wichita
House: RBF Flipping a Cowling Gore into Place to Check its Fit |
46 |
|
2-26 |
Wichita
House: Assembled Cowling |
" |
|
2-27 |
Wichita
House: Details of Base Mast |
47 |
|
2-28 |
Wichita
House: Testing the Pullout Resistance of One of the 12 Earth-Anchors |
" |
|
2-29 |
Wichita
House: Cable Stays being Rigged by Dymaxion Dwelling Machine Co VP C Lacey |
49 |
|
2-30 |
Wichita
House: Tension Rod Spokes Position the Compression Rings |
50 |
|
2-31 |
Wichita
House: Structural Cage being Tightened |
" |
|
2-32 |
Wichita
House: 18'-Diam Vent Cap being Lifted into Position |
" |
|
2-33 |
Wichita
House: Floor Plan |
51 |
|
2-34 |
Wichita
House: RBF with Opera Star M Anderson Testing Acoustics |
53 |
|
2-35 |
Wichita
House: Cutaway View of Model |
54 |
|
2-36 |
Wichita
House: View of Master Bedroom |
" |
|
2-37 |
Wichita
House: Detail View of Ovolving Shelves |
55 |
|
2-38 |
Wichita
House: View of Living Room |
" |
|
L |
The Wichita House
Lives On |
56 |
|
2-39 |
Wichita
House: Close-Up On Wichita Businessman's Property |
58 |
|
2-40 |
Wichita
House: Floor Being Disassembled |
59 |
|
2-41 |
Wichita
House: Base Ring Being Disassembled |
" |
|
2-42 |
Wichita
House: Site Model of a proposed US Air Force Officer Housing Subdivision |
60 |
|
2-43 |
Wichita
House: View Across Pond on Wichita Businessman's Property |
" |